Appendix 5.5 Cyan Route Option Figures

Figure 1.1_Cyan Route Option_Plan Layout

Figure 3.2.1 Cyan Route Option with Ecology Constraints – Habitats (Sheet 1of 2)

Figure 3.2.2 Cyan Route Option with Ecology Constraints – Habitats (Sheet 2of 2)

Figure 3.2.3 Cyan Route Option with Ecology Constraints – Bat Species (Sheet 1of 2)

Figure 3.2.4 Cyan Route Option with Ecology Constraints – Bat Species (Sheet 2of 2)

Figure 3.2.5 Cyan Route Option with Ecology Constraints – Other Species (Sheet 1of 2)

Figure 3.2.6 Cyan Route Option with Ecology Constraints – Other Species (Sheet 2of 2)

Figure 3.2.7 Cyan Route Option  with Annex I Habitats at Lough Corrib cSAC crossing

Figure 3.3.1_Cyan Route Option with Soils and Geology Constraints (Sheet 1 of 2)

Figure 3.3.2_Cyan Route Option_Soils and Geology Constraints (Sheet 2 of 2)

Figure 3.3.3_Cyan Route Option with Solid Geology (Sheet 1 of 2)

Figure 3.3.4_Cyan Route Option with Solid Geology (Sheet 2 of 2)

Figure 3.3.5_Cyan Route Option with Soils Map (Sheet 1 of 2)

Figure 3.3.6_Cyan Route Option with Soils Map (Sheet 2 of 2)

Figure 3.3.7_Cyan Route Option with Subsoils Map (Sheet 1 of 2)

Figure 3.3.7_Cyan Route Option with Subsoils Map (Sheet 1 of 2)

Figure 3.3.9_Cyan Route Option with Soft Compresible Ground (Sheet 1 of 2)

Figure 3.3.10_Cyan Route Option with Soft Compressible Ground (Sheet 2 of 2)

Figure 3.3.11_Cyan Route Option with Principal Cuttings and Embankments (Sheet 1of 2)

Figure 3.3.12_Cyan Route Option with Principal Cuttings and Embankments (Sheet 2 of 2)

Figure 3.4.1_Cyan Route Option with Hydrogeology Constraints (Sheet1of2)

Figure 3.4.2_Cyan Route Option with Hydrogeology Constraints (Sheet2of2)

Figure 3.5.1 Cyan Route Option with Hydrology Catchments(Sheet1of2)

Figure 3.5.2  Cyan Route Option with Hydrology Catchments(Sheet2of2)

Figure 3.5.3 Cyan Route Option with Flood Risk Mapping-Pluvial&Groundwater(Sheet 1of2)

Figure 3.5.4 Cyan Route Option with Flood Risk Mapping-Pluvial&Groundwater(Sheet 2of2)

Figure 3.5.5 Cyan Route Option with Flood Risk Mapping -Fluvial & Coastal (Sheet 1 of 2)

Figure 3.5.6 Cyan Route Option with Flood Risk Mapping -Fluvial & Coastal (Sheet 2 of 2)

Figure 3.6.1_ Cyan Route Option with Landscape and Visual features (Sheet 1 of 2)

Figure 3.6.2_ Cyan Route Option with Landscape and Visual features (Sheet 2 of 2)

Figure 3.7.1 Cyan Route Option with Archeo._Architec._Cultural Heritage (Sheet1of4)

Figure 3.7.2 Cyan Route Option with Archeo._Architec._Cultural Heritage (Sheet2of4)

Figure 3.7.3 Cyan Route Option with Archeo._Architec._Cultural Heritage (Sheet3of4)

Figure 3.7.4 Cyan Route Option with Archeo._Architec._Cultural Heritage (Sheet4of4)

Figure 3.8.1_Cyan Route Option with Material Assets-Agri Constraints(Sheet 1of2)

Figure 3.8.2_Cyan Route Option with Material Assets -Agri Constraints(Sheet 2of2)

Figure 3.9.1 Cyan Route Option with Material Assets Non Agri Property Impacts(Sheet1of2)

Figure 3.9.2 Cyan Route Option with Material Assets Non Agri Property Impacts(Sheet2of2)

Figure 3.9.3 Cyan Material Assets Non-Agricultural-Bord Gáis_ESB_SSE (Sheet 1 of 2)

Figure 3.9.4 Cyan Material Assets Non-Agricultural-Bord Gáis_ESB_SSE (Sheet 2 of 2)

Figure 3.10.1_Cyan Route Option with Air Constraints (Sheet 1of2)

Figure 3.10.2_Cyan Route Option with Air Constraints (Sheet 2of2)

Figure 3.11.1_Cyan Route Option with Noise Constraints(Sheet1of2)

Figure 3.11.2_Cyan Route Option with Noise Constraints(Sheet2of2)

Figure 3.12.1_Cyan Route Option with Human Being Constraints(Sheet1of2)

Figure 3.12.2_Cyan Route Option with Human Being Constraints(Sheet2of2)