Updates

Bulletin # 21 Update – 11/09/2019

The response to the Request for Further Information (RFI) received from An Bord Pleanála (ABP) was submitted Friday 30 August 2019. ABP …

Design Update: – 26/10/2016

Individual landowner letters and drawings have been posted to all directly impacted landowners to provide an update on the project, the current …

Design Update: Menlough and Coolough area – 17/06/2016

Please find the following link to drawings showing the latest design from the River Corrib to the N84 Headford Road: http://www.n6galwaycity.ie/wp-content/uploads/2016/06/GCOB-SK-D-679-680_River_Corrib-to-N84_Current_Design2-Sheets.pdf We …

Volume 3 – Appendices

Volume 3A – Appendices Part 1 Volume 3B – Appendices Part 2 Volume 3C – Appendices Part 3 Volume 3D – Appendices …

Volume 3A – Appendices Part 1

Volume 3A _ Appendix Part 1 Table of Contents A.2.1 Phase 1 Preliminary Appraisal A.3.1 Traffic Modelling Report A.3.1 Traffic Modelling Report …

Volume 3B – Appendices Part 2

Volume 3B – Appendix Table of Contents A.4.1 Public Consultation No. 1_I2 A.4.2 Ecological Constraints Report – Appendix A A.4.2 Ecological Constraints …

Volume 3C – Appendices Part 3

Volume 3C – Appendix Part 3 Table of Contents A.5.1 Lough Corrib Route Options A.5.2 Coastal Route Options Report A.5.3 On-line Report …

Appendix 5.4 2006 GCOB Figures

Figure 1.1 2006 GCOB Route Option_Plan Layout Figure 3.2.1 2006 GCOB Route Option with Ecology Constraints _ Habitats_Sheet 1of2 Figure 3.2.2 2006 …

Appendix 5.5 Cyan Route Option Figures

Figure 1.1_Cyan Route Option_Plan Layout Figure 3.2.1 Cyan Route Option with Ecology Constraints – Habitats (Sheet 1of 2) Figure 3.2.2 Cyan Route …

Volume 3D – Appendices Part 4

Volume 3D – Appendix Part 4 Table of Contents A.7.1 Green2 – Blue2 Switch Route Option Report_I2 A.7.1 Green2 – Blue2 Switch …